About Tecnirolo
In1993 created Tecnirolo Ltd, to start working in areas of 3D design with the 2000 Solution software and machining in 3D with WorkNC, was the first company to have CAD / CAM solutions for the industry , plastic and automotive industry .
In 1994 we started working with CAMAX for 5-axis machining, and participated in several projects for the construction of complex parts for military aircraft.
In 1996 developed the first system to control production for industrial machines, named Tecmonitor, and still is sold today under the name Factory Monitor.
In 1999 took the course in high-speed machining in IGERSOLL (Germany), and began to apply this technology in many factories today have more the 100 clients who began working with this technical collaboration.
In 2000 make a new project to a company Fornoceramica ( one of the largest manufacture of ovens for ceramic ) to improve energy efficiency on ovens gas burners , with a new tree way flame control (burn control ,atmosphere control , and exhaust control ) this system save at lest 15% energy .In 2004 began developing the first draft for the application in the industry of molds for shoe soles, this project is to automate the entire process manufacturing, reducing costs by 50%, some processes are patented.
In 2005 develop the first high precision foundry for the shoe mold industry with a partnership with STOTEK in Denmark , this project reduce de costs up to 50%.
In 2006 start working on a project for rubber injection machine specially designed for the industry of shoe soles,in 2008 start the production in China of the rubber injection twin technology. In 2009 installation with success the first 32 machines with new rubber twin injection rubber machines.
In 2011 develop a new concept to integration of the design and the mold production to reduce the time bet win the idea and the final product , named ID-Product
In 2012 Grendene (bigger shoe mold factory in Latin America apply the ID- Product concept
In 2013 install with success the new generation of the the twin rubber injection that are 40 % faster than the old one
2013 start the new development of a 3 color multi assemble plastic injection for the plastic shoe industry , to be produce in china in 2014 , prototype will be ready in November